Pro-Spec Trade Services
Cinematic night view of a premium modern Perth CBD office fit-out with floor-to-ceiling windows over the city

Office Fit-Outs Perth CBD · 6000

Commercial Office Fit-Out — Perth CBD Tower

Full electrical, data and lighting fit-out for a 1,200m² Perth CBD corporate floor — sub-mains, GPOs, structured cabling and a UniFi network stack.

Overview

A professional-services tenant took a full floor in a St Georges Terrace tower and needed a complete electrical and low-voltage fit-out in a tight 6-week window before move-in. We coordinated with the builder, joinery and AV trades to deliver every power, data and lighting circuit on schedule.

Works included a new sub-board, ~180 GPOs, dimmable circadian lighting across open-plan and boardrooms, structured Cat6A cabling to every desk, and a UniFi Network stack with PoE switches feeding access points and door access. All cable trays were installed in the ceiling cavity during the night shift to keep day-time builder access clear.

The fit-out passed handover certification first attempt, with full as-built documentation, certificates of compliance and a labelled patch panel that the tenant's IT team could pick up and run with on day one.

Equipment used

  • New 200A sub-board with TPN distribution
  • ~180 commercial-grade GPOs and dedicated workstation circuits
  • DALI dimmable LED lighting across open-plan and boardrooms
  • Cat6A structured cabling — 110 active outlets, 24U comms rack
  • UniFi Network stack — UDM Pro, Pro 48 PoE switches, U6 Pro APs

Outcomes

  • Delivered on a 6-week fixed schedule with zero defects at handover
  • Full as-built documentation and labelled patch panel
  • Single point of contact across electrical, data, lighting and network
  • Out-of-hours rough-in to protect builder programme

FAQ

Common questions

Can you work to a builder's programme?+

Yes — every commercial fit-out we do is staged against the builder's programme with rough-in, fix-out and handover milestones clearly mapped and documented.

Do you handle after-hours work in Perth CBD towers?+

Most of our CBD work is after-hours or out-of-hours by default. We're across building manager inductions, dock bookings and after-hours access protocols for every major Perth tower.

Is the structured cabling certified?+

All Cat6A runs are tested, certified and delivered with a per-port test report — required for any serious commercial tenant or insurance audit.

More projects

Related case studies

Want a result like this on your site?

Same-day quotes across Perth and Sydney. Licensed, insured and fully documented handover on every job.