Three-Phase Switchboard Upgrade — Midland Industrial
Full switchboard replacement and three-phase upgrade for a Midland industrial workshop — modern protection, accurate labelling and documented handover.
Overview
A Midland industrial workshop was operating on a switchboard that pre-dated current AS/NZS 3000 wiring rules — overloaded circuits, mis-labelled breakers and no RCD protection on critical equipment. Insurance had flagged it as a renewal risk. We carried out a full replacement with a new modern enclosure, fresh main switch and a sub-board layout that matched how the business actually used power.
Every circuit was traced, tested, re-labelled and protected with appropriate RCD/RCBO devices. Critical production circuits got dedicated protection so a fault in the office can't drop the workshop floor. The upgrade was staged in two weekend shifts so the workshop never lost a trading day.
Handover included a labelled schedule, full test results and a certificate of electrical compliance — everything the insurer asked for, plus a switchboard the next sparky will thank us for.
Equipment used
- New modern industrial switchboard enclosure
- 200A main switch + 3-phase distribution
- RCBO protection on every final sub-circuit
- Dedicated production circuits with selective protection
- Labelled schedule + test certificates
Outcomes
- Brought up to current AS/NZS 3000 standard
- Zero trading-day disruption — works staged over two weekends
- Insurance renewal concerns resolved
- Labelled, documented switchboard with full test results
FAQ
Common questions
Do we need a full switchboard replacement?+
Not always — sometimes a switchboard can be upgraded in-place. We do a no-obligation inspection first and only recommend a full replacement when it's the right call commercially and electrically.
Can the upgrade happen without shutting down?+
For most commercial sites, yes — we stage the works over after-hours or weekend shifts so production isn't disrupted. We always supply a written cutover plan first.
What documentation do we get?+
A labelled circuit schedule, full test results, certificate of electrical compliance, and as-built drawings of the new switchboard layout.